How long does permit review take?

By The Archtri team · Last reviewed

Permit review time varies widely by jurisdiction, project type and how complete the submittal is. A small project can move faster than a large or complex one, and resubmittals add time. Your building department can tell you its current review times, and a complete drawing set helps you avoid delays.

Key takeaways

  • There is no universal timeline: it depends on the jurisdiction, workload and project type.
  • Incomplete or inconsistent drawings are one of the most common causes of delay.
  • Several departments may each review the plans, such as zoning, building, fire and flood.
  • Ask your building department for current review times and whether it offers expedited options.

Why is there no single answer?

Every building department sets its own process, staffing and workload. A rural county and a busy coastal city can differ greatly, and the same office can move at different speeds in different months. Some jurisdictions publish target review times and some do not. Some states set statutory deadlines for certain review steps, but those rules differ by state and project type, so check what applies to you.

For that reason we do not quote review timelines. Anyone who promises a fixed number of days without knowing your jurisdiction is guessing. The reliable source is your local building department.

What happens during permit review?

After you submit, the department typically checks that the application is complete, then routes the plans to one or more reviewers. Depending on the project, these can include zoning for setbacks and lot coverage, building for code compliance, structural, mechanical, electrical and plumbing, fire, flood plain management and utilities.

Each reviewer can approve the plans or issue comments. If comments are issued, the applicant revises the drawings and resubmits, and the cycle repeats until all reviewers are satisfied. Then the permit is issued and construction can begin.

What slows permit review down?

These are the usual causes of delay:

  • Missing sheets, unclear dimensions or details that do not match across pages.
  • Drawings that reference the wrong code edition or miss local amendments.
  • No sealed documents where the jurisdiction requires them.
  • Missing supporting documents such as a survey, product approvals or energy forms.
  • Zoning or setback conflicts discovered during review instead of before.
  • HOA, historic or other approvals that must be obtained separately.
  • Backlogs at the building department, especially in busy seasons or after storms.

How can I reduce delays?

Get the submittal checklist before drawing starts and follow it exactly. Confirm setbacks and zoning limits during design, not after submittal. Make sure sheet information is consistent: the floor plan, elevations and schedules should agree. Include every supporting document in the first submittal.

Respond quickly and completely to comments. A short, clear response with revised sheets generally moves a project faster than a partial one. Our guide to what a permit-ready drawing set includes lists the sheets and documents reviewers commonly expect.

Does Archtri submit permits or manage the review?

Archtri prepares the drawings. Contractors, builders, architects and owners usually submit the permit application, though the arrangement depends on the project. If the building department sends comments on drawings we prepared, we revise the affected sheets according to the scope in your written quote. Confirm this before work begins.

To plan your project, request a complimentary quote and tell us your city. You can also read about Florida and Texas projects for local context. Always verify current review times and procedures with the building department.

How should I plan my project schedule around review?

Treat review as a variable in your schedule rather than a fixed block. Build in time for at least one round of comments, especially for larger projects. Do not order long-lead materials or schedule crews until the permit is in hand. Ask the building department how it handles inspections and how far in advance you must schedule them. If you have financing or a contractor start date tied to the permit, tell your drafter so the drawings are prioritized and the submittal is complete.

Frequently asked questions

Can I speed up permit review?

Some departments offer expedited or third-party review options. Ask yours. The most reliable way to avoid delays is a complete, consistent first submittal.

What is a resubmittal?

A resubmittal is a revised set of drawings sent back to the building department after it issues comments. Each cycle adds time, so complete responses matter.

Does a bigger project take longer?

Often, because more reviewers and more sheets are involved, but the jurisdiction and the quality of the submittal matter just as much.

Where do I check current review times?

The building department website or front desk is the best source. Some publish current turnaround estimates, and others will give them if you call.