Drafting and permit guides

Straight answers to the questions homeowners, contractors and builders ask before they draw, permit and build. Last reviewed 2026-11-20.

What is included in a permit-ready drawing set?

A plain-language list of what a permit-ready residential drawing set usually contains, from site plan and floor plans to elevations, sections, details and notes.

Do I need an architect or a drafter for a home addition?

How to decide between an architect and a drafter for a home addition, based on scope, structural complexity, local rules and who must seal the drawings.

How much do permit drawings cost?

What drives the price of permit drawings, how drafting quotes are built, and how to get an accurate written quote for your project.

What are as-built drawings and when do you need them?

As-built drawings document a building as it exists today. Learn what they include, when permits or renovations call for them and how they differ from a survey.

How long does permit review take?

Permit review time varies by jurisdiction and project. Learn what affects it, what slows it down and how complete drawings help you avoid delays.

Florida wind load and flood requirements for residential drawings

How Florida wind design and flood zone requirements affect residential drawings, from wind-borne debris regions to base flood elevation and product approvals.

Texas ADU and addition drawings: what to know

What to know before drawing a Texas accessory dwelling unit or home addition: local zoning, setbacks, utilities, code editions and what the drawings should show.

2D drawings vs 3D renderings: which do you need?

Understand the difference between 2D construction drawings and 3D renderings, what each is used for and when a project needs one, the other or both.